| Other Recent Projects |
|
46' Lobster Yacht Skeg Repair (Before) |
![]() |
(After) |
|
51' Modern schooner with carbon fiber masts Remove inadequate mast tracks. Prepare masts for installation of new mast tracks. Glue on mast tracks with epoxy adhesive, no fastenings used. Fair and paint masts in way of new tracks. (Before) |
![]() |
(After) |
|
Class 40 Keel Refit (Before) |
![]() |
(During) |
![]() |
(After) |
![]() |
Galley Modification and Entertainment System Modification of galley cabinetry and installation of espresso machine. |
![]() |
Custom designed and installed Bang & Olufsen flat screen TV and surround sound system. |
![]() |
Custom Galley Cabinetry |
![]() |
|
![]() |
Cap Rails and Custom Chock New teak cap rails and custom bronze chocks on a 51' schooner. |
![]() |
|
![]() |
|
![]() |
Custom Spray Rails Custom designed and built spray rails. |
![]() |
Mahogany rails were laminated to boat, removed for fairing and than epoxy glued and fastened to boat. |
![]() |
Rails were than faired to hull, epoxy sealed, primed and painted with Awlgrip |
![]() |
Spray rails finished and Awlgripped. |
![]() |
|
![]() |
New varnish for the transom of a Vicem 51 Before. |
![]() |
After. |
![]() |
Mast Step Replacement This vintage 6 meter racing sloop had a rotten mast step, which we replaced with new laminated step. |
![]() |
Custom mounting brackets MYC built mounting brackets in the mid-ship bilge for spare propellers on a beautiful Vicem 58 motoryacht.
|























